Rail & mass-transit safety assurance
Integrated Assured Solutions holds the independent line on safety-critical rail programmes — and produces the evidence that lets regulators authorise them, on time.
What we do
Engage the whole scope, or a single package — remotely or on-site, at a day rate, as a fixed-price package, or on retainer.
Track record
Issued the Statements of No-Objection that enabled safety authorisation and revenue service with the Transport General Authority.
Authored the integrated and operational test strategy, aligning MEP, fire and route-wide systems across stations, shafts and portals.
RAM analysis surfaced 34 of 63 station zones missing their availability target — unseen until the reliability data was joined up.
Project Director reporting to the Channel Tunnel Safety Authority and the ORR, securing operational-integration approvals.
An appointed ISA role, a RAMS package, or a two-week health-check to see where the assurance really stands.